About us
 
1990

Construction of the Pardatschgratbahn
 
 
 
1991

The Muller ski lift is replaced by a fixed quad chair lift
 
 
1992 -1993

Construction of the tennis centre (4 indoor and 4 outdoor courts) and the outdoor pool
 
 
1993

Construction of the Flimjochbahn (high-speed quad) and the Velilleckbahn
Building of the new restaurant “La Marmotte“
Opening-up of Alp Trida – Viderjoch
 
 
1994

Construction of the Höllspitzbahn (high-speed quad) as replacement for the Höllspitzlift
New construction of the high-speed quad chair lifts Alp Trida - Flimsattel and Alp Trida – Visnitz
 
 
1995

Construction of the Velillbahn (detachable 6-seater) which replaces 2 surface lifts. Reconstruction of the Idalpe self-service restaurant.
Construction of the 2nd feeder lift "Twinliner" in Samnaun
Building of the restaurant Alp Bella
 
 
 
1996

Reconstruction of the Palinkopfbahn (high-speed quad) which replaces the double chair lift; building of an underground parking garage with 200 lots, escalator at the Pardatschgratbahn, construction of the high-speed quad Alp Bella - Grivalea.
 
 
 
1997

Construction Sassgalunbahn (fixed 6-seater) to replace surface lift.
Preliminary works for the new Silvrettabahn (funitel); the Fimbabahn is replaced by the Silvrettabahn.
Carcass work for the village tunnel (tunnel linking the centre and the Fimbabahn)
 
 
 
1998

The Silvrettabahn is upgraded to a funitel system
Replacement of the Fimbabahn by the former Silvrettabahn
Construction of the Höllkarbahn (detachable 6-seater) replacing the two surface lifts
New building of the detachable 6-seater chair lift Planer Salaas - Greitspitz with bubble.
 
 
Completion of the village tunnel with band conveyor and lift
 
 
1999

New construction of the Schwarzwasserlift